Alabama Power 25-IC-1362 (25-IC-1362)

Alabama Power 25-IC-1362 is a 195.0 MW solar interconnection project in Marengo County, Alabama with a current status of withdrawn. It is proposed to connect at Greene County - Octagon 115 kV Line.

195.0 MWCapacity
WithdrawnStatus
ALMarket
SolarTechnology

Project facts

Canonical nameAlabama Power 25-IC-1362
Queue ID25-IC-1362
Statuswithdrawn
Source statusRequest Withdrawn
MarketAL
TechnologySolar
Capacity195.0 MW
StateAlabama
CountyMarengo County
Point of interconnectionGreene County - Octagon 115 kV Line
Requested (queue) date2025-04-17
Proposed in-service date2029-07-27
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata