Alabama Power 25-IC-1370 (25-IC-1370)

Alabama Power 25-IC-1370 is a 160.0 MW solar interconnection project in Perry County, Alabama with a current status of active. It is proposed to connect at Greene County - North Selma 230 kV Line.

160.0 MWCapacity
ActiveStatus
ALMarket
SolarTechnology

Project facts

Canonical nameAlabama Power 25-IC-1370
Queue ID25-IC-1370
Statusactive
Source statusGIA Draft
MarketAL
TechnologySolar
Capacity160.0 MW
StateAlabama
CountyPerry County
Point of interconnectionGreene County - North Selma 230 kV Line
Requested (queue) date2025-04-17
Proposed in-service date2029-09-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata