Alabama Power 25-IC-1382 (25-IC-1382)

Alabama Power 25-IC-1382 is a 707.0 MW gas interconnection project in Mobile County, Alabama with a current status of active. It is proposed to connect at Bucks SS Substation 230 kV Bus.

707.0 MWCapacity
ActiveStatus
ALMarket
GasTechnology

Project facts

Canonical nameAlabama Power 25-IC-1382
Queue ID25-IC-1382
Statusactive
Source statusGIA Draft
MarketAL
TechnologyGas
Capacity707.0 MW
StateAlabama
CountyMobile County
Point of interconnectionBucks SS Substation 230 kV Bus
Requested (queue) date2025-04-17
Proposed in-service date2031-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata