Alabama Power 25-SIC-015 (25-SIC-015)

Alabama Power 25-SIC-015 is a 200.0 MW battery interconnection project in Bullock County, Alabama with a current status of active. It is proposed to connect at Thurlow Dam - Union Springs 115 kV Line.

200.0 MWCapacity
ActiveStatus
ALMarket
BatteryTechnology

Project facts

Canonical nameAlabama Power 25-SIC-015
Queue ID25-SIC-015
Statusactive
Source statusGIA Draft
MarketAL
TechnologyBattery
Capacity200.0 MW
StateAlabama
CountyBullock County
Point of interconnectionThurlow Dam - Union Springs 115 kV Line
Requested (queue) date2025-12-19
Proposed in-service date2027-11-19
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata