Alabama Power 26-IC-1426 (26-IC-1426)

Alabama Power 26-IC-1426 is a 150.0 MW solar interconnection project in Shelby County, Alabama with a current status of active. It is proposed to connect at East Chelsea - Lay Dam 115 kV Line.

150.0 MWCapacity
ActiveStatus
ALMarket
SolarTechnology

Project facts

Canonical nameAlabama Power 26-IC-1426
Queue ID26-IC-1426
Statusactive
Source statusCluster Study
MarketAL
TechnologySolar
Capacity150.0 MW
StateAlabama
CountyShelby County
Point of interconnectionEast Chelsea - Lay Dam 115 kV Line
Requested (queue) date2026-03-25
Proposed in-service date2030-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata