Alabama Power 26-IC-1436 (26-IC-1436)
Alabama Power 26-IC-1436 is a 200.0 MW solar interconnection project in Montgomery County, Alabama with a current status of withdrawn. It is proposed to connect at Pike County - Snowdoun 230 kV Line.
200.0 MWCapacity
WithdrawnStatus
ALMarket
SolarTechnology
Project facts
| Canonical name | Alabama Power 26-IC-1436 |
|---|---|
| Queue ID | 26-IC-1436 |
| Status | withdrawn |
| Source status | Request Withdrawn |
| Market | AL |
| Technology | Solar |
| Capacity | 200.0 MW |
| State | Alabama |
| County | Montgomery County |
| Point of interconnection | Pike County - Snowdoun 230 kV Line |
| Requested (queue) date | 2026-03-25 |
| Proposed in-service date | 2029-05-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Alabama Power Co |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata