Alabama Power 26-IC-1445 (26-IC-1445)

Alabama Power 26-IC-1445 is a 300.0 MW battery interconnection project in Mobile County, Alabama with a current status of withdrawn. It is proposed to connect at Bucks SS Substation 230 kV Bus.

300.0 MWCapacity
WithdrawnStatus
ALMarket
BatteryTechnology

Project facts

Canonical nameAlabama Power 26-IC-1445
Queue ID26-IC-1445
Statuswithdrawn
Source statusRequest Withdrawn
MarketAL
TechnologyBattery
Capacity300.0 MW
StateAlabama
CountyMobile County
Point of interconnectionBucks SS Substation 230 kV Bus
Requested (queue) date2026-03-30
Proposed in-service date2030-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.