Alabama Power 26-IC-1468 (26-IC-1468)

Alabama Power 26-IC-1468 is a 260.0 MW battery interconnection project in Walker County, Alabama with a current status of active. It is proposed to connect at Goodsprings TS Substation 230 kV Bus.

260.0 MWCapacity
ActiveStatus
ALMarket
BatteryTechnology

Project facts

Canonical nameAlabama Power 26-IC-1468
Queue ID26-IC-1468
Statusactive
Source statusCluster Study
MarketAL
TechnologyBattery
Capacity260.0 MW
StateAlabama
CountyWalker County
Point of interconnectionGoodsprings TS Substation 230 kV Bus
Requested (queue) date2026-03-26
Proposed in-service date2028-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata