Alabama Power APCQF-1105 (APCQF-1105)

Alabama Power APCQF-1105 is a 80.0 MW solar interconnection project in Walker County, Alabama with a current status of active. It is proposed to connect at Oakman TS Substation 161 kV Bus.

80.0 MWCapacity
ActiveStatus
ALMarket
SolarTechnology

Project facts

Canonical nameAlabama Power APCQF-1105
Queue IDAPCQF-1105
Statusactive
Source statusGIA with NTP
MarketAL
TechnologySolar
Capacity80.0 MW
StateAlabama
CountyWalker County
Point of interconnectionOakman TS Substation 161 kV Bus
Requested (queue) date2023-01-03
Proposed in-service date2028-12-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata