Alabama Power APCQF-706 (APCQF-706)

Alabama Power APCQF-706 is a 80.0 MW solar interconnection project in Escambia County, Alabama with a current status of withdrawn. It is proposed to connect at Atmore - Flomaton 115 kV Line.

80.0 MWCapacity
WithdrawnStatus
ALMarket
SolarTechnology

Project facts

Canonical nameAlabama Power APCQF-706
Queue IDAPCQF-706
Statuswithdrawn
Source statusGIA Terminated
MarketAL
TechnologySolar
Capacity80.0 MW
StateAlabama
CountyEscambia County
Point of interconnectionAtmore - Flomaton 115 kV Line
Requested (queue) date2018-05-21
Proposed in-service date2022-04-14
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.