Alabama Power APCQF-783 (APCQF-783)
Alabama Power APCQF-783 is a 80.0 MW solar interconnection project in Clarke County, Alabama with a current status of operational. It is proposed to connect at Belleville - Lowman 230 kV Line.
80.0 MWCapacity
OperationalStatus
ALMarket
SolarTechnology
Project facts
| Canonical name | Alabama Power APCQF-783 |
|---|---|
| Queue ID | APCQF-783 |
| Status | operational |
| Source status | Commercial Operation |
| Market | AL |
| Technology | Solar |
| Capacity | 80.0 MW |
| State | Alabama |
| County | Clarke County |
| Point of interconnection | Belleville - Lowman 230 kV Line |
| Requested (queue) date | 2019-03-14 |
| Proposed in-service date | 2024-12-15 |
| Operational date | 2024-12-15 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Alabama Power Co |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.