Alabama Power APCQF-931 (APCQF-931)
Alabama Power APCQF-931 is a 79.9 MW solar interconnection project in Dale County, Alabama with a current status of withdrawn. It is proposed to connect at Dothan - Pinckard No. 2 115 kV Line.
79.9 MWCapacity
WithdrawnStatus
ALMarket
SolarTechnology
Project facts
| Canonical name | Alabama Power APCQF-931 |
|---|---|
| Queue ID | APCQF-931 |
| Status | withdrawn |
| Source status | Request Withdrawn |
| Market | AL |
| Technology | Solar |
| Capacity | 79.9 MW |
| State | Alabama |
| County | Dale County |
| Point of interconnection | Dothan - Pinckard No. 2 115 kV Line |
| Requested (queue) date | — |
| Proposed in-service date | 2030-03-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Alabama Power Co |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata