Alabama Power IC-030 (IC-030)

Alabama Power IC-030 is a 900.0 MW gas interconnection project in Blount County, Alabama with a current status of withdrawn. It is proposed to connect at Miller - Bellefonte 500 kV Tie-line.

900.0 MWCapacity
WithdrawnStatus
ALMarket
GasTechnology

Project facts

Canonical nameAlabama Power IC-030
Queue IDIC-030
Statuswithdrawn
Source status—
MarketAL
TechnologyGas
Capacity900.0 MW
StateAlabama
CountyBlount County
Point of interconnectionMiller - Bellefonte 500 kV Tie-line
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-12

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata