Alabama Power IC-043 (IC-043)

Alabama Power IC-043 is a 622.0 MW gas interconnection project in Tuscaloosa County, Alabama with a current status of withdrawn. It is proposed to connect at Duncanville 230 kV substation.

622.0 MWCapacity
WithdrawnStatus
ALMarket
GasTechnology

Project facts

Canonical nameAlabama Power IC-043
Queue IDIC-043
Statuswithdrawn
Source status—
MarketAL
TechnologyGas
Capacity622.0 MW
StateAlabama
CountyTuscaloosa County
Point of interconnectionDuncanville 230 kV substation
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date2001-08-13
Developer—
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-12

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata