Alabama Power IC-050 (IC-050)

Alabama Power IC-050 is a 1,800.0 MW gas interconnection project in Talladega County, Alabama with a current status of withdrawn. It is proposed to connect at Gaston 230 kV substation.

1,800.0 MWCapacity
WithdrawnStatus
ALMarket
GasTechnology

Project facts

Canonical nameAlabama Power IC-050
Queue IDIC-050
Statuswithdrawn
Source status
MarketAL
TechnologyGas
Capacity1,800.0 MW
StateAlabama
CountyTalladega County
Point of interconnectionGaston 230 kV substation
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date2001-11-21
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata