Alabama Power IC-065 is a 610.0 MW gas interconnection project in Lee County, Alabama with a current status of withdrawn. It is proposed to connect at Goat Rock Substation 230 kV Bus.

610.0 MWCapacity
WithdrawnStatus
ALMarket
GasTechnology

Project facts

Canonical nameAlabama Power IC-065
Queue IDIC-065
Statuswithdrawn
Source status
MarketAL
TechnologyGas
Capacity610.0 MW
StateAlabama
CountyLee County
Point of interconnectionGoat Rock Substation 230 kV Bus
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date2003-05-22
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata