Alabama Power IC-088 (IC-088)

Alabama Power IC-088 is a 640.0 MW gas interconnection project in Dale County, Alabama with a current status of withdrawn. It is proposed to connect at Pinckard 230 kV Substation.

640.0 MWCapacity
WithdrawnStatus
ALMarket
GasTechnology

Project facts

Canonical nameAlabama Power IC-088
Queue IDIC-088
Statuswithdrawn
Source status—
MarketAL
TechnologyGas
Capacity640.0 MW
StateAlabama
CountyDale County
Point of interconnectionPinckard 230 kV Substation
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date2002-03-25
Developer—
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-12

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.