Alabama Power IC-1012 (IC-1012)

Alabama Power IC-1012 is a 657.0 MW gas interconnection project in Autauga County, Alabama with a current status of active. It is proposed to connect at South Bessemer - Snowdoun 500 kV Line.

657.0 MWCapacity
ActiveStatus
ALMarket
GasTechnology

Project facts

Canonical nameAlabama Power IC-1012
Queue IDIC-1012
Statusactive
Source statusGIA Draft
MarketAL
TechnologyGas
Capacity657.0 MW
StateAlabama
CountyAutauga County
Point of interconnectionSouth Bessemer - Snowdoun 500 kV Line
Requested (queue) date2020-10-15
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.