Alabama Power IC-108 (IC-108)

Alabama Power IC-108 is a 657.0 MW gas interconnection project in Autauga County, Alabama with a current status of withdrawn. It is proposed to connect at Autaugaville Substation 230 kV Bus.

657.0 MWCapacity
WithdrawnStatus
ALMarket
GasTechnology

Project facts

Canonical nameAlabama Power IC-108
Queue IDIC-108
Statuswithdrawn
Source status
MarketAL
TechnologyGas
Capacity657.0 MW
StateAlabama
CountyAutauga County
Point of interconnectionAutaugaville Substation 230 kV Bus
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date2002-11-26
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata