Alabama Power IC-1091 (IC-1091)

Alabama Power IC-1091 is a 300.0 MW battery interconnection project in Mobile County, Alabama with a current status of active. It is proposed to connect at Big Creek - Chickasaw 230 kV Line.

300.0 MWCapacity
ActiveStatus
ALMarket
BatteryTechnology

Project facts

Canonical nameAlabama Power IC-1091
Queue IDIC-1091
Statusactive
Source statusGIA in Suspension
MarketAL
TechnologyBattery
Capacity300.0 MW
StateAlabama
CountyMobile County
Point of interconnectionBig Creek - Chickasaw 230 kV Line
Requested (queue) date2022-11-17
Proposed in-service date2027-03-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata