Alabama Power IC-1102 (IC-1102)

Alabama Power IC-1102 is a 400.0 MW battery interconnection project in Montgomery County, Alabama with a current status of active. It is proposed to connect at Snowdoun TS Substation 230 kV Bus.

400.0 MWCapacity
ActiveStatus
ALMarket
BatteryTechnology

Project facts

Canonical nameAlabama Power IC-1102
Queue IDIC-1102
Statusactive
Source statusGIA in Suspension
MarketAL
TechnologyBattery
Capacity400.0 MW
StateAlabama
CountyMontgomery County
Point of interconnectionSnowdoun TS Substation 230 kV Bus
Requested (queue) date2022-12-12
Proposed in-service date2026-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata