Alabama Power IC-1171 (IC-1171)

Alabama Power IC-1171 is a 80.0 MW solar interconnection project in Greene County, Alabama with a current status of withdrawn. It is proposed to connect at Epes - Eutaw 115 kV Line.

80.0 MWCapacity
WithdrawnStatus
ALMarket
SolarTechnology

Project facts

Canonical nameAlabama Power IC-1171
Queue IDIC-1171
Statuswithdrawn
Source statusRequest Withdrawn
MarketAL
TechnologySolar
Capacity80.0 MW
StateAlabama
CountyGreene County
Point of interconnectionEpes - Eutaw 115 kV Line
Requested (queue) date2023-09-05
Proposed in-service date2027-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata