Alabama Power IC-251 (IC-251)

Alabama Power IC-251 is a 1,830.0 MW gas interconnection project in Lee County, Alabama with a current status of withdrawn. It is proposed to connect at Goat Rock Substation 230 kV Bus.

1,830.0 MWCapacity
WithdrawnStatus
ALMarket
GasTechnology

Project facts

Canonical nameAlabama Power IC-251
Queue IDIC-251
Statuswithdrawn
Source statusRequest Withdrawn
MarketAL
TechnologyGas
Capacity1,830.0 MW
StateAlabama
CountyLee County
Point of interconnectionGoat Rock Substation 230 kV Bus
Requested (queue) date2011-02-18
Proposed in-service date2014-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata