Alabama Power IC-323 (IC-323)

Alabama Power IC-323 is a 88.4 MW wind interconnection project in Cleburne County, Alabama with a current status of withdrawn. It is proposed to connect at Bremen - Crooked Creek 115 kV Line.

88.4 MWCapacity
WithdrawnStatus
ALMarket
WindTechnology

Project facts

Canonical nameAlabama Power IC-323
Queue IDIC-323
Statuswithdrawn
Source status
MarketAL
TechnologyWind
Capacity88.4 MW
StateAlabama
CountyCleburne County
Point of interconnectionBremen - Crooked Creek 115 kV Line
Requested (queue) date2013-11-11
Proposed in-service date
Operational date
Withdrawn date2014-05-19
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.