Alabama Power IC-684 (IC-684)

Alabama Power IC-684 is a 30.0 MW solar interconnection project in Russell County, Alabama with a current status of withdrawn. It is proposed to connect at Fort Benning #2 Substation 46 kV Bus.

30.0 MWCapacity
WithdrawnStatus
ALMarket
SolarTechnology

Project facts

Canonical nameAlabama Power IC-684
Queue IDIC-684
Statuswithdrawn
Source statusRequest Withdrawn
MarketAL
TechnologySolar
Capacity30.0 MW
StateAlabama
CountyRussell County
Point of interconnectionFort Benning #2 Substation 46 kV Bus
Requested (queue) date2018-03-21
Proposed in-service date2020-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata