Alabama Power IC-783 (IC-783)

Alabama Power IC-783 is a 80.0 MW solar interconnection project in Clarke County, Alabama with a current status of withdrawn. It is proposed to connect at Belleville - Lowman 230 kV Line.

80.0 MWCapacity
WithdrawnStatus
ALMarket
SolarTechnology

Project facts

Canonical nameAlabama Power IC-783
Queue IDIC-783
Statuswithdrawn
Source statusGIA Terminated
MarketAL
TechnologySolar
Capacity80.0 MW
StateAlabama
CountyClarke County
Point of interconnectionBelleville - Lowman 230 kV Line
Requested (queue) date2019-03-14
Proposed in-service date2023-01-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata