Alabama Power IC-791 (IC-791)

Alabama Power IC-791 is a 889.5 MW gas interconnection project in Lamar County, Alabama with a current status of operational. It is proposed to connect at Valley View Substation (TVA).

889.5 MWCapacity
OperationalStatus
ALMarket
GasTechnology

Project facts

Canonical nameAlabama Power IC-791
Queue IDIC-791
Statusoperational
Source statusCommercial Operation
MarketAL
TechnologyGas
Capacity889.5 MW
StateAlabama
CountyLamar County
Point of interconnectionValley View Substation (TVA)
Requested (queue) date2019-05-09
Proposed in-service date2020-07-06
Operational date2020-07-06
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.