Alabama Power IC-954 (IC-954)

Alabama Power IC-954 is a 80.0 MW solar interconnection project in Conecuh County, Alabama with a current status of active. It is proposed to connect at Evergreen - North Brewton 115 kV Line.

80.0 MWCapacity
ActiveStatus
ALMarket
SolarTechnology

Project facts

Canonical nameAlabama Power IC-954
Queue IDIC-954
Statusactive
Source statusGIA in Suspension
MarketAL
TechnologySolar
Capacity80.0 MW
StateAlabama
CountyConecuh County
Point of interconnectionEvergreen - North Brewton 115 kV Line
Requested (queue) date2021-04-15
Proposed in-service date2026-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata