Albany County 2 is a 20.0 MW solar interconnection project in Albany, New York with a current status of operational. It is proposed to connect at Long Lane - Lafarge 115kV.

20.0 MWCapacity
OperationalStatus
FMarket
SolarTechnology

Project facts

Canonical nameAlbany County 2
Queue ID0598
Statusoperational
Source status14
MarketF
TechnologySolar
Capacity20.0 MW
StateNew York
CountyAlbany
Point of interconnectionLong Lane - Lafarge 115kV
Requested (queue) date2017-01-10
Proposed in-service date
Operational date
Withdrawn date
DeveloperHecate Energy
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata