ALGONQUIN POWER SANGER 2 (955)

ALGONQUIN POWER SANGER 2 is a 48.3 MW gas interconnection project with a current status of withdrawn. It is proposed to connect at Sanger Co-gen 115/13.8kV Sub.

48.3 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameALGONQUIN POWER SANGER 2
Queue ID955
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity48.3 MW
State
County
Point of interconnectionSanger Co-gen 115/13.8kV Sub
Requested (queue) date2013-04-30
Proposed in-service date
Operational date
Withdrawn date2020-04-01
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata