Allegheny Hydro No 9 (50898_GEN2)

Allegheny Hydro No 9 is a 8.9 MW other interconnection project in Armstrong, Pennsylvania with a current status of operational.

8.9 MWCapacity
OperationalStatus
PJMMarket
OtherTechnology

Project facts

Canonical nameAllegheny Hydro No 9
Queue ID50898_GEN2
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologyOther
Capacity8.9 MW
StatePennsylvania
CountyArmstrong
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1990-12-01
Withdrawn date
Developer
Utility / transmission ownerAllegheny Hydro Group Lock and Dam 4, Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata