Alma Center- Merrillan (DCP) 69 KV (J2868)

Alma Center- Merrillan (DCP) 69 KV is a 46.2 MW solar interconnection project in Jackson, Wisconsin with a current status of withdrawn. It is proposed to connect at Alma Center- Merrillan (DCP) 69 KV.

46.2 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameAlma Center- Merrillan (DCP) 69 KV
Queue IDJ2868
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity46.2 MW
StateWisconsin
CountyJackson
Point of interconnectionAlma Center- Merrillan (DCP) 69 KV
Requested (queue) date2022-09-15
Proposed in-service date2026-12-01
Operational date2026-12-01
Withdrawn date2025-08-04
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05statusoperationalwithdrawnhigh
2026-08-05withdrawn_date2025-08-04high
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.