Amber Solar and Storage (1246)

Amber Solar and Storage is a 232.0 MW other interconnection project in St. Lawrence County, New York with a current status of withdrawn. It is proposed to connect at Moses - Massena MMS 1 230kV.

232.0 MWCapacity
WithdrawnStatus
DMarket
OtherTechnology

Project facts

Canonical nameAmber Solar and Storage
Queue ID1246
Statuswithdrawn
Source status0
MarketD
TechnologyOther
Capacity232.0 MW
StateNew York
CountySt. Lawrence County
Point of interconnectionMoses - Massena MMS 1 230kV
Requested (queue) date2021-09-14
Proposed in-service date2023-02-28
Operational date
Withdrawn date
DeveloperHanwha Q CELLS USA
Utility / transmission ownerNYPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.