American Bumper Junction to David Junction 138Kv (J1554)
American Bumper Junction to David Junction 138Kv is a 150.0 MW solar interconnection project in Ionia, Michigan with a current status of withdrawn. It is proposed to connect at American Bumper Junction to David Junction 138Kv.
150.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology
Project facts
| Canonical name | American Bumper Junction to David Junction 138Kv |
|---|---|
| Queue ID | J1554 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Solar |
| Capacity | 150.0 MW |
| State | Michigan |
| County | Ionia |
| Point of interconnection | American Bumper Junction to David Junction 138Kv |
| Requested (queue) date | 2020-06-24 |
| Proposed in-service date | 2023-09-15 |
| Operational date | 2023-09-15 |
| Withdrawn date | 2020-11-24 |
| Developer | — |
| Utility / transmission owner | METC |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.