Amite 115 kV Substation (J909)

Amite 115 kV Substation is a 100.0 MW solar interconnection project in Tangipahoa Parish, Louisiana with a current status of operational. It is proposed to connect at Amite 115 kV Substation.

100.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameAmite 115 kV Substation
Queue IDJ909
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity100.0 MW
StateLouisiana
CountyTangipahoa Parish
Point of interconnectionAmite 115 kV Substation
Requested (queue) date2017-06-16
Proposed in-service date2021-09-01
Operational date2021-09-01
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata