Amite Energy Storage II (E0024)

Amite Energy Storage II is a 207.9 MW battery interconnection project in Tangipahoa Parish, Louisiana with a current status of active. It is proposed to connect at Amite 115kV Substation.

207.9 MWCapacity
ActiveStatus
MISOMarket
BatteryTechnology

Project facts

Canonical nameAmite Energy Storage II
Queue IDE0024
Statusactive
Source statusactive
MarketMISO
TechnologyBattery
Capacity207.9 MW
StateLouisiana
CountyTangipahoa Parish
Point of interconnectionAmite 115kV Substation
Requested (queue) date2025-08-06
Proposed in-service date2028-02-25
Operational date
Withdrawn date
DeveloperNextera
Utility / transmission ownerDEMCO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata