Andes Substation 230 kV (J3764)

Andes Substation 230 kV is a 170.0 MW solar interconnection project in Madison, Mississippi with a current status of operational. It is proposed to connect at Andes Substation 230 kV.

170.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameAndes Substation 230 kV
Queue IDJ3764
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity170.0 MW
StateMississippi
CountyMadison
Point of interconnectionAndes Substation 230 kV
Requested (queue) date2024-04-18
Proposed in-service date2028-03-01
Operational date2028-03-01
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata