Antrim Wind (59953_AWND1)

Antrim Wind is a 28.8 MW wind interconnection project in Hillsborough, New Hampshire with a current status of operational.

28.8 MWCapacity
OperationalStatus
ISNEMarket
WindTechnology

Project facts

Canonical nameAntrim Wind
Queue ID59953_AWND1
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyWind
Capacity28.8 MW
StateNew Hampshire
CountyHillsborough
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2019-12-01
Withdrawn date—
Developer—
Utility / transmission ownerAntrim Wind Energy LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata