Arkwright Summit (0421)
Arkwright Summit is a 78.4 MW wind interconnection project in Chautauqua, New York with a current status of operational. It is proposed to connect at Dunkirk - Falconer 115 kV.
78.4 MWCapacity
OperationalStatus
AMarket
WindTechnology
Project facts
| Canonical name | Arkwright Summit |
|---|---|
| Queue ID | 0421 |
| Status | operational |
| Source status | 14 |
| Market | A |
| Technology | Wind |
| Capacity | 78.4 MW |
| State | New York |
| County | Chautauqua |
| Point of interconnection | Dunkirk - Falconer 115 kV |
| Requested (queue) date | 2013-11-01 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Arkwright Summit Wind Farm LLC |
| Utility / transmission owner | NM-NG |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata