Arnold 115kV (GEN-2014-041)

Arnold 115kV is a 120.8 MW wind interconnection project in Ness, Kansas with a current status of withdrawn. It is proposed to connect at Arnold 115kV.

120.8 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameArnold 115kV
Queue IDGEN-2014-041
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity120.8 MW
StateKansas
CountyNess
Point of interconnectionArnold 115kV
Requested (queue) date2014-09-30
Proposed in-service date2018-02-27
Operational date
Withdrawn date2017-09-23
Developer
Utility / transmission ownerSUNC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata