Arnold - Perkins 138 kV Line Tap (J1252)

Arnold - Perkins 138 kV Line Tap is a 20.0 MW battery interconnection project in Marquette County, Michigan with a current status of withdrawn. It is proposed to connect at Arnold - Perkins 138 kV Line Tap.

20.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameArnold - Perkins 138 kV Line Tap
Queue IDJ1252
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity20.0 MW
StateMichigan
CountyMarquette County
Point of interconnectionArnold - Perkins 138 kV Line Tap
Requested (queue) date2019-04-29
Proposed in-service date2022-10-30
Operational date2022-10-30
Withdrawn date2021-02-08
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata