Arnott - Golden Sands 138.0kV (S1129)
Arnott - Golden Sands 138.0kV is a 50.3 MW battery interconnection project in Portage, Wisconsin with a current status of operational. It is proposed to connect at Arnott - Golden Sands 138.0kV.
50.3 MWCapacity
OperationalStatus
—Market
BatteryTechnology
Project facts
| Canonical name | Arnott - Golden Sands 138.0kV |
|---|---|
| Queue ID | S1129 |
| Status | operational |
| Source status | Active |
| Market | — |
| Technology | Battery |
| Capacity | 50.3 MW |
| State | Wisconsin |
| County | Portage |
| Point of interconnection | Arnott - Golden Sands 138.0kV |
| Requested (queue) date | 2025-10-07 |
| Proposed in-service date | 2026-03-21 |
| Operational date | 2026-03-21 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | AMERICAN TRANSMISSION COMPANY |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.