Arpin 345kV is a 100.0 MW solar interconnection project in Wood, Wisconsin with a current status of withdrawn. It is proposed to connect at Arpin 345kV.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameArpin 345kV
Queue IDJ1510
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateWisconsin
CountyWood
Point of interconnectionArpin 345kV
Requested (queue) date2020-06-16
Proposed in-service date2023-10-01
Operational date2023-10-01
Withdrawn date2023-11-17
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.