Arpin (J2559)

Arpin is a 200.0 MW solar interconnection project in Wood, Wisconsin with a current status of withdrawn. It is proposed to connect at Arpin.

200.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameArpin
Queue IDJ2559
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity200.0 MW
StateWisconsin
CountyWood
Point of interconnectionArpin
Requested (queue) date2022-09-14
Proposed in-service date2029-07-18
Operational date2029-07-18
Withdrawn date2026-10-20
Developer—
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-05withdrawn_date—2026-10-20high
2026-11-05statusoperationalwithdrawnhigh
2026-10-31phasePhase 2Phase 3low
2026-10-14phasePhase 1Phase 2low
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata