Arrowhead - Stone Lake 345kV Line (J732)

Arrowhead - Stone Lake 345kV Line is a 527.8 MW gas interconnection project in Douglas County, Wisconsin with a current status of operational. It is proposed to connect at Arrowhead - Stone Lake 345kV Line.

527.8 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameArrowhead - Stone Lake 345kV Line
Queue IDJ732
Statusoperational
Source statusDone
Market
TechnologyGas
Capacity527.8 MW
StateWisconsin
CountyDouglas County
Point of interconnectionArrowhead - Stone Lake 345kV Line
Requested (queue) date2017-06-16
Proposed in-service date2021-06-08
Operational date2021-06-08
Withdrawn date
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata