Arrowrock Hydroelectric Project (651)

Arrowrock Hydroelectric Project is a 1.5 MW other interconnection project in Ada, Idaho with a current status of operational. It is proposed to connect at EKRT-041 Distribution Feeder.

1.5 MWCapacity
OperationalStatus
IDMarket
OtherTechnology

Project facts

Canonical nameArrowrock Hydroelectric Project
Queue ID651
Statusoperational
Source statusIn Service
MarketID
TechnologyOther
Capacity1.5 MW
StateIdaho
CountyAda
Point of interconnectionEKRT-041 Distribution Feeder
Requested (queue) date2022-04-05
Proposed in-service date
Operational date2022-05-01
Withdrawn date
DeveloperArrowrock Hydroelectric Project
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata