Arroyo Solar Energy Storage Hybrid (63172_ARESS)

Arroyo Solar Energy Storage Hybrid is a 150.0 MW battery interconnection project in McKinley, New Mexico with a current status of operational.

150.0 MWCapacity
OperationalStatus
PNMMarket
BatteryTechnology

Project facts

Canonical nameArroyo Solar Energy Storage Hybrid
Queue ID63172_ARESS
Statusoperational
Source status(OP) Operating
MarketPNM
TechnologyBattery
Capacity150.0 MW
StateNew Mexico
CountyMcKinley
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2023-07-01
Withdrawn date—
Developer—
Utility / transmission ownerArroyo Solar LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.