Arsenal Hill 138 kV Substation (GEN-2022-185)

Arsenal Hill 138 kV Substation is a 46.0 MW other interconnection project in Caddo Parish, Louisiana with a current status of withdrawn. It is proposed to connect at Arsenal Hill 138 kV Substation.

46.0 MWCapacity
WithdrawnStatus
LAMarket
OtherTechnology

Project facts

Canonical nameArsenal Hill 138 kV Substation
Queue IDGEN-2022-185
Statuswithdrawn
Source statusWITHDRAWN
MarketLA
TechnologyOther
Capacity46.0 MW
StateLouisiana
CountyCaddo Parish
Point of interconnectionArsenal Hill 138 kV Substation
Requested (queue) date2023-02-28
Proposed in-service date2024-12-31
Operational date
Withdrawn date2023-11-07
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata