Asbury 161 kV Substation (GEN-2022-146)

Asbury 161 kV Substation is a 150.0 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at Asbury 161 kV Substation.

150.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameAsbury 161 kV Substation
Queue IDGEN-2022-146
Statuswithdrawn
Source statusWITHDRAWN
Market—
TechnologyBattery
Capacity150.0 MW
State—
County—
Point of interconnectionAsbury 161 kV Substation
Requested (queue) date2023-02-24
Proposed in-service date2027-12-31
Operational date—
Withdrawn date2023-11-06
Developer—
Utility / transmission ownerEDE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata