ASD Carmen PA2 Solar (AH1-159)
ASD Carmen PA2 Solar is a 20.0 MW solar interconnection project in Crawford, Pennsylvania with a current status of withdrawn. It is proposed to connect at Conneaut-Conneaut Tap 69 kV.
20.0 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology
Project facts
| Canonical name | ASD Carmen PA2 Solar |
|---|---|
| Queue ID | AH1-159 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | PJM |
| Technology | Solar |
| Capacity | 20.0 MW |
| State | Pennsylvania |
| County | Crawford |
| Point of interconnection | Conneaut-Conneaut Tap 69 kV |
| Requested (queue) date | 2021-08-30 |
| Proposed in-service date | 2023-11-01 |
| Operational date | — |
| Withdrawn date | 2025-07-07 |
| Developer | ASD Carmen PA2 Solar LLC |
| Utility / transmission owner | ATSI |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata